A lightning protection system was installed on the roof of the hotel, which included placing lightning rods on the flagpoles and bonding conductors (collectors and down conductors). Furthermore, the grounding system of the building was extended and the bonding conductors were connected to it. In addition, surge arresters were installed on the hotel’s distribution electrical panels.